Skip to content

 Conveyor Lead Times Killing Your Project?

 Get a fully assembled GUF-P 2000 conveyor shipped in 10 business days.

Conveyor Lead Times Killing Your Project?

Get a fully-assembled GUF-P 2000 conveyor shipped in 10 business days.
  • No partial shipments 

  • No “kit of parts”

  • No guessing if it will work

Let’s Be Honest About Conveyor Lead Times

Most conveyor projects don’t fail because of design.
  • Lead times blow past your schedule

  • Internal deadlines don’t move

  • You’re stuck explaining delays you can’t control

What the Priority Ship Program Actually Is

This is not a rush order. It’s a predefined, production-ready version of the GUF-P 2000 flat belt conveyor that allows us to ship fast without cutting corners.
  • Fully assembled conveyor

  • Tested before it leaves our facility

  • Ships in 10 business days!

 Compare VersaFlex Conveyor Systems

P1025965

Available Configurations

Designed for product handling through curves, inclines, and compact layouts.
  • Widths up to 800 mm

  • Lengths up to 6 meters

  • Speeds up to 100 ft/min

  • Load capacity up to 100 lbs

P1026868

What You Don’t Have to Worry About

Because the last thing you need is another variable.
  • Missing components

  • Field assembly headaches

  • “It looked good on paper” problems

  • Delays from custom engineering cycles


See GUF-P 2000 in Action

Watch how the GUF-P 2000 handles real product movement in a compact layout.

Watch how the GUF-P 2000 moves product through a compact, production-ready layout. This is the same conveyor included in the Priority Ship Program—fully assembled, tested, and shipped in 10 business days.


Where It’s Used

  • Packaging lines
  • Assembly operations
  • Material transfer
  • General manufacturing

The GUF-P 2000 is trusted by manufacturers, OEMs, and system integrators across North America.


Get in Touch With mk North America